Machine Introduction
With Syntec EZ-4ME control system, Yaskawa servo motors, HSD air cooling spindle, Delta inverter ,Becker vacuum pum all components are from global leaders.
NO. | Description | Parameter |
1 | X,Y,Z Working Area | 1300x2500x(300-700mm)*±180° |
2 | Table Size | 1300×3000mm |
3 | X,Y,Z Traveling Positioning Accuracy | ±0.01/300mm |
4 | X,Y,Z Repositioning Accuracy: | ±0.01mm |
5 | Table Surface | Vacuum and T-slot Combined (Option: T-slot Table) |
6 | Frame | Big Steel Tube Structure |
7 | X, Y Structure | Helical rack gear , HIWIN Linear guide |
8 | Z Structure | Imported Ball Screw , HIWIN Linear guide |
9 | Max. Power Consumption | (Without Spindle) 4.2Kw |
10 | Max. Rapid Travel Rate | 40000mm/min |
11 | Max. Working Speed | 30000mm/min |
12 | Spindle Power | HSD spindle 4.5kw( Italy ATC spindle for option) |
13 | Spindle Speed | 0-18000RPM |
14 | Drive Motors | Japan 850 W YASKAWA servo motor |
15 | Working Voltage | AC380V/50/60Hz,3PH (Option: 220V)) |
16 | Command Language | G Code |
17 | Operating System | SYNTEC Control System (model: EZ4M) |
18 | Computer Interface | USB |
19 | Flash Memory | 512M |
20 | Collet | ER25 |
21 | X,Y Resolution | <0.01mm |
22 | Software Compatibility | UG , Power mill |
23 | Running Environment Temperature | 0 – 45 Centigrade |
24 | Relative Humidity | 30% – 75% |
25 | Packing Size | 4.1*2.3*2.6m |
26 | N.W. | 2500KG |
27 | G.W. | 2800KG |
28 | Optional Parts | Dust Collector/ Dust Hoods for three Axis |
Vacuum Pump | ||
Rotary System | ||
Mist-cooling System | ||
SIEMENS/DELTA/ Panasonic Servo Motors | ||
Colombo Spindle | ||
X:2.5m, Y:4m, Z:1.2m |
Q5.How about your after-sales service?
we offer you 24 hours service phone,skype or whatsapp, our engineer also can go to door install or training.
Q6. Quality Control:
The whole production procedure will be under regular inspection and strict quality control. The complete machine will be tested to
make sure they can work very well before being out of factory.
The testing video and pictures will be available before delivery.